Home > english-chinese > "bridge surface" in Chinese

Chinese translation for "bridge surface"

桥接面

Related Translations:
bridging:  n.1.造桥,架桥。2.【建筑】搁栅撑。
bridge:  n.1.桥,桥梁;【造船】舰桥,船桥。2.鼻梁;(假牙上的)齿桥;【音乐】弦柱,弦马;【电学】电桥;【机械工程】天车,桥架;【台球】球棒架。3.(文艺作品的)过渡性章节,过场;穿插,插曲。短语和例子a bridge of boats 船桥。 a bascule bridge 活动桥。 a suspension [wire] bridge 吊桥,悬索桥。 Wheatstone
bridged:  跨接的用风桥接通的
bridges:  n.布里奇斯【姓氏】。
Example Sentences:
1.Construct a three dimensional space finite element analysis model for the steel mix joint part of road bridge surface , study the distribution complexion of strain field in the steel combine part , and judge its endurance and safety capabilities
对公路桥面板钢混结合部位,建立三维空间有限元分析模型,研究钢混结合部位的应力场的分布情况,评判该部位的受力性能及安全性能。
2.When whole analysis is carried through the beam - lattice method and bridge surface is made of box beams with one box and two cells , according to the principle of constant bending rigidity and every part revolving the same neutral axis , a box beam can be simplified into three beams in the places of corresponding webs . thus effective transfer of shearing force can be ensured , and global property can be reached through that of three beams , this kind of method is simple and is able to ensure engineering precision ; secondly , the paper is based on elastic theory , adopts finite element method and carries through the first kind stability analysis towards zhongshan no . one bridge
在选用梁格法进行整体分析时,遇到桥面系是单箱双室的箱型梁时,按照抗弯刚度不变且各部分绕着同一中性轴的原则,将一个箱型梁在相应的腹板处简化成3根梁,能够保证剪力的有效传递,而且可以由这划分的3根梁的性能得到箱型梁结构的总性能,这种方法简便易行且能保证工程精度;其次,本文基于弹性理论,采用有限元法对中山一桥进行了第一类稳定分析。
3.Fabrication of the box beam is divided into such parts as reinforcement , formwork , concreting , prestressing , moving and storing of beam , pipe grouting under pressure , end sealing of the beam , water - proof layer on the bridge surface system , protective coating etc . the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects , such technologies as : manufacturing and fixing of reinforcement , steel reinforcement fixing baseplate , web plate and top plate respectively and lifting the steel skeleton into form , requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork , optimization of concrete ratio , concrete pouring process of two ends of beam in priority over the middle , in sequence of first baseplate followed by web plate and top plate at last , concrete pouring in inclined section and in horizontal layer , concrete vibration mainly by external vibrator in assistance with internal vibrator , methods and regulation for steam curing of concrete , dual controls over stress and strain to ensure quality of prestressing workmanship , construction method of effective beam moving by heavy - weight special moving facility , some regulations and key notes about construction of grouting under pressure , beam ends sealing , water - proof layer on the bridge surface system , protective coating
箱梁制造由钢筋工程、模板工程、混凝土工程、预应力工程、移存梁工程、孔道压浆工程、梁体封端工程、桥面防水层和保护层工程等施工环节组成。文中介绍的采用胎具制作和绑扎钢筋,分底腹板和顶板分别绑扎并吊装钢筋骨架入模;拆装式和液压式两种模板的设计、制作要求和使用方法;综合考虑、优化混凝土配合比,混凝土灌注从两端至中间、先底板、后腹板、再顶板的施工顺序和斜向分段、腹板水平分层、附着式振捣为主、插入式捣固为辅的施工工艺,蒸汽养护的方法和规定;应力应变双控制确保预应力施工质量的施工技术;采用重物移运器有效移梁的施工方法;压浆、封端、桥面防水层和保护层施工的一些规定和注意事项等都是对箱梁制造行之有效的施工技术和施工方法,并可为以后类似施工作借鉴。
4.Draw some valuable conclusions by the calculation analysis of the anchorage zones of cable support tower and beam , and the steel mix joint part of of the road bridge surface , which will have some instruction meaning and reference value to the design and construction of the anchorage zone of the similar bridge
通过对天兴洲大桥的索塔锚固区、索梁锚固区以及公路桥面板的钢混结合段的计算分析,得出一些有价值的结论,对今后同类桥型锚固区的设计、施工具有一定的指导意义和参考价值。
5.For floors where abrasion and impact resistance as well as dust - proof are required such as for shed , loading area at port , machinery industry , aitcraft parking apron , garage , parking area , oil storage piant , pathway floor , mine chute , bridge surface , reservior overflow relief channel , energu consumption . loading slope , military industry , weaving mills , cold storage plant , automobile industry , electronic industry express highway , etc
仓库、码头装卸区、机械工厂、飞机停机坪、车库、停车场、油料库、通道地面、工矿溜槽、桥面、水库溢洪道、交通池、装卸斜坡、军工企业、纺织业、冷冻库房、汽车工业、电子工业、高速公路等适合金属骨料要求的混凝土地面。
6.Secondly , according to the theory of impact echo method examining flaws , the road surface and the bridge surface are aimed as study targets , four concrete plates are made with differently deep surface - opening cracks . using the experimental system of impact echo method made by sansalone etc . , this paper measures the stress waves velocity conveying in concrete plates by using one transducer or two transducers , and measures the depth of surface - opening cracks in concrete plates by using two transducers , and then the important data are attained
接着,根据冲击反射法检测结构物缺陷的原理,以路面和桥面的开口裂纹为研究对象,制作了带有不同深度开口裂纹的混凝土板块,使用sansalone等人开发的冲击反射法实验系统,用单传感器和双传感器分别对混凝土板块内应力波传播的速度和不同深度的开口裂纹进行了测量,得到了重要的实验数据。
Similar Words:
"bridge structure static testing" Chinese translation, "bridge structures design criteria" Chinese translation, "bridge substructure" Chinese translation, "bridge superstructure" Chinese translation, "bridge support" Chinese translation, "bridge survey" Chinese translation, "bridge table" Chinese translation, "bridge tabulation" Chinese translation, "bridge tank" Chinese translation, "bridge tap" Chinese translation